In order to ensure that the various operations of the vacuum negative pressure station are in standard conditions, so as to ensure the correct operation of the operators and ensure the safe production, the commissioning, startup and shutdown operations of the equipment must be standardized. The correct operation methods are as follows.

 

     1. Connect the power line and grounding line, and check whether the main voltage is correct and the three-phase power supply is correct.

 

     2. Check whether the H2O level is in the proper position. There is a mark on the H2O level gauge of the existing vacuum pump station.

 

     3. Whether all valves are open.

 

     4. Check whether all electric control lines of the vacuum negative pressure station are connected.

 

     5. Check whether the water ring pump is stuck by hand before starting.

 


     6. Within 2 seconds after pressing the start button, immediately press the stop button to check whether the direction of rotation is consistent with the direction of the arrow on the end face (shaft extension) of the nose. If the direction of rotation is wrong, please exchange any two of the three power cords.

View more quality glove boxes with low price and free shipping all over the world. 


  • Sep 24, 2020
  • Category: Glove Box
  • Comments: 0
Comments: 0

No comments

Leave a Reply

Your email address cannot be published. Required fields are marked*