Glove box purging:

 

(After opening the purging, the inlet pressure can be appropriately reduced)

 

1) Definition: Replace the gas in the chamber with working gas, and the gas in the chamber is discharged from the purging valve on the top of the glove box.

 

2) Purging steps:

 

Ensure sufficient working gas;

 

Close the loop;

 

Open purging;

 

Adjust the auxiliary gauge of the pressure reducing valve and set the pressure to 0.1-0.2Mpa


3) Reasons for purging:

 

First debugging;

 

Not activated for a long time;

 

Incorrect operation, causing air to enter;

 

Remove organic solvents, acid-base solvents and other substances harmful to the glove box in the box (excessive content of organic solvents will affect the normal operation of the oxygen probe and the circulation system).


  • Aug 03, 2021
  • Category: Glove Box
  • Comments: 0
Comments: 0

No comments

Leave a Reply

Your email address cannot be published. Required fields are marked*